PUBLIC WORKS DEPARTMENT,—Continued.
Other Charges,—Continued
Brought forward
Conveyance and Motor Allowances,—Continued.
General Works.
4 Engineers, 1 at $660 2 at $240 each and I at $244.
Inspector of Works at $480
3 Overseers, 1 at $480 1 at $360, 1 at $270
1 Assistant Quantity Surveyor at $180
2 Assistant Land Surveyors, at $180 each.......
2 Apprentice Surveyors at $180 each
1 Foreman at $240
Port Development.
2 Engineers, 1 at $480, 1 at $360
3 Overseers, 1 at $360 and 2 at $180 each.
Assistant Engineer at $240
Public Health and Buildings Ordinance, 1903.
6 Engineers, I at $360, 1 at $244 and 4 at $240 each
1 Inspector of Works at $270
1 Chief draughtsman at $180
9 Overseers, 2 at $480 carb, 2 at $360 each, 2 at $270 eacli,
1 at $240 and 2 at $180 each
1 Assistant Land Surveyor at $180
1 Foreman at $240
Roads, Piers, Bridges, etc., (Maintenance).
4 Engineers, I at $540, 2 at $360 each and 1 at $240..
1 Mechanical Engineer at 8240
1 Inspector of Works at $270)
7 Overseers, 3 at $480 each, I at $360, 1 at $240 and 2 at $180
eacht
2 Assistant Land Surveyors at $180 each
1 Apprentice Surveyor at $180.............
Surveys.
1 Superintendent of Surveys at $360
1 Assistant Superintendent at $360
9 Land Surveyors, 2 at $540 each and 7 at $360 each
24 Assistant Land Surveyors, 8 at $360 each and 16 at $180 each
9 Apprentice Surveyors, 3 at $180 each and 6 at $120 each.....
Valuations and Resumption.
2 Engineers at $240 each
2 Assistant Land Surveyors at $180 each
Waterworks, (Maintenance.)
3 Engineers, I at $420, 1 at $244 and 1 at $240
2 Senior Inspectors of Works, at $480 each plus Pony
Allowance to 1 at $180
3 Inspectors of Works at $480 each
7 Overseers, 3 at 480 each, 2 at $360 each, 1 at $270, and
1 at $180.
1 Chief Water Works Inspector at $180
12 Water Works Inspectors at $180 each
1 Watchman, Tytam Reservoir, Pony Allowance at $240
Carried forward
*
[1,318,115
$
1,650,203
79.9.32
50,000
1,378,067
(1) Certain Allowances detailed expected to lapse.
Head 29.-PUBLIC WORKS DEPARTMENT
Approved Estimate, 1930.
Estimate, 1931.
$
PUBLIC WORKS DEPARTMENT,-Continued.
Other Charges,-Continued
Sub-heads:-
Brought forward
1,378,067
1.700,203
3 Drawing Materials and Mounting Plans....
8,000
7,000
4 Electric Fans and Light
25.000
26,000
5 Incidental Expenses
10,000
9,000
6 Lifts Maintenance, Government Buildings
7,000
6,000
7 Maintenance and Supply of Furniture.....
16,500
45,000
(3)
Surveying Instruments and Contingencies
2,000
2,500
9 Transport and Travelling Expenses
12,000
15,000
(2)
10 Uniforms...
2,000
3.500
11 Upkeep of Government Garage Plant.
1,000
1,000
12 Upkeep and running expenses of Motor Lorries and Cars.....
30,000
30,000
13 Upkeep of Motor and Steam Rollers,
7,000
8,000
14 Upkeep of Quarry Plants
18,000
20,000
(2)
15 Upkeep of Triangulation Monaments
1,000
500
(1)
Radio Telegraph Branch.
16 Incidental Expenses
1,000
1,000
17 Repairs, Stores, and Current...
30,000
18 Transport
4,000
36,400 1,000
(4)
$
SPECIAL EXPENDITURE.
19 Additional Plant and Masts for Cape D'Aguitar W. T. Station... 20 Harbour Surveying
21 30 Rollers for Botanical and Forestry Department
22 3 Sets of Microphone and Amplifying Gears for broadcasting.
23 Standard Wave Moter Equipment
24 Alteration to certain W./T. Transmitter
29.8001
5,000 |
525
5.100
10,000
50,000
25 New 3 phase transformer for Cape D'Aguilar W./T. Station
26 Lathe for Electric Workshop in Arsenal Street
27 1 Band Saw and lathe for furniture repairs..
1,400 (2)
1,000
2,500
28 1 Light Petrol Road Roller (Barford and Perkins Type "A",
1 tons)
29 Spare Generator and Associated Switch Gear
Rent of Offices for Radio-telegraplis
Additional 5-K.W. Short wave Transmitter
One New Steam Roller...
Motor Workshop Equipment (Additional)
Two Morris Minor Motor Cars....
One Motor Car (replacement)
5,300
10,200 J
15,000
(5)
50,000
8,300
5,200
3,200
3,500
Two Combined key board Transmitter and Printers
3,120
One key board Perforator
1,020
One High Speed Morse Transmitter
600
High Speed recording undulators (inkers) with accessories
Wave meter and Instruments
2,0.0)
Filament batteries with charging equipment
2,000
Additional Dynamo Panel for Cape D'Aguilar WT. Station Harbour Surveying
960
5,000
Total Public Works Department
1.654.477
2,038,928
(1) Considered sufficient.
1,700.203
(4) Increase traffic.
(2) Considered necessary.
(3) l'art previously included in Public Works Extraordinary.
(5) Now paid from Head 11. (Post Office).
(6) Non-recurrent.
206